Where the rule comes from
In June 2026 Building Commission NSW issued an advisory note, Note 1/2026, on overflow relief gullies. It applies to all of NSW and was written in response to non-compliant gullies found in the commission’s inspections: an ongoing issue with gullies installed without the required height clearances. It explains the requirements of the Australian Standard AS/NZS 3500.2:2026 for plumbers, builders and building designers.
The first height: below the lowest fixture
Clause 4.6.6.6 of the standard says the top of the overflow gully riser must be at least 150 mm lower than the lowest fixture connected to the drain. Because the gully’s top must sit below the lowest fixture, it ends up lower than every fixture on that drain. Where the 150 mm is measured from depends on the fixture:
| Fixture | Measured from |
|---|---|
| A soil fixture with an integral trap | The top surface level of the water seal |
| A floor waste gully or a shower | The top surface level of the grate |
| A soil fixture in an outbuilding or room whose floor is graded to an outside doorway | The overflow rim of the fixture |
| Other fixtures, including greywater diversion devices | The top surface level of the fixture outlet |
The height is a vertical measurement, taken from the gully riser’s overflow level or from the overflow pipe’s invert.
The second height: above the ground
Clause 4.6.6.7 requires the top of the gully riser (or the overflow pipe’s invert) to sit at least 75 mm above the finished surface level around it. There is one exception. Where the gully riser is in a path or a paved area, it “shall be finished at a level so as to prevent the ponding and ingress of water”.
The note asks plumbers to put the gully where both heights can be achieved, and to consider any future landscaping or paths that could change them. It is one reason to know where the gully is before you raise a garden bed or lay a path beside the house.
Whose job it is to get right
- The plumber sets the levelsLicensed plumbers are responsible for working out the correct gully levels before they start, which means checking final slab heights and finished ground levels with the builder.
- The builder and designer allow for itBuilders and building designers must make sure the slab and ground levels let the plumbing comply, including the gully, as the National Construction Code’s drainage provisions require.
When the heights cannot be met
Where a plumber cannot achieve the 150 mm height below the lowest fixture, clause 4.5.2 of the standard says a reflux valve shall be installed. The NSW variation to the Plumbing Code of Australia then requires that no sanitary drainage or sanitary plumbing waste stack is installed upstream of that valve.
Three more points from Building Commission NSW’s reflux valve note:
- “Where a surcharge is likely to occur a reflux valve shall be installed immediately downstream of the boundary trap or inspection shaft.” The invert of its outlet must sit at least 80 mm higher than the invert of the water utility’s system it connects to.
- Where a reflux valve is installed, it remains the property owner’s responsibility.
- Network utility operators, the note names Sydney Water among them, may set their own soffit height requirements and may also know of surcharge conditions in their mains. “Where such conditions exist, a reflux valve must be installed in accordance with NSW Variation C2D4(d).”
The size of a gully, other places it may go, rules for flood-affected areas, and when one may be left out are all in clause 4.6.6 of the standard, which the note points to rather than repeats.